This week, crews are finishing preparing the road for paving. Today, Thursday, May 9 at 7 AM, crews closed the eastbound lane on S Columbian Way between Beacon Ave S and 24th Ave S to do base repairs. This detour will last through end of day Friday, May 10.

Nighttime paving for S Columbian Way and S Alaska St is scheduled to begin as early as Monday, May 13. Paving was delayed due to the need for additional base repair work. We appreciate your patience.
Please see below for additional details about upcoming work.


Upcoming work
Westbound traffic on S Columbian Way and S Alaska St will be closed during paving work.
Crews will be doing base repair work on S Columbian Way between Beacon Ave S and 24th Ave S.
  • Work hours from 7 AM to 5 PM, Thursday, May 9 and Friday, May 10
  • Crews will close the eastbound lane on S Columbian Way between Beacon Ave S and 24th Ave S
  • Detour: Eastbound traffic will be detoured to S Ferdinand St and 24th Ave S
Nighttime paving work starting on S Columbian Way / S Alaska St (excluding the Beacon Ave S intersection).
  • Work hours from 7 PM to 7 AM starting as early as Monday, May 13
  • Paving will take about 3 days to complete
  • Crews plan to start paving the eastbound lane on S Columbian Way and S Alaska St, and S Alaska Pl Monday night
  • Detours and traffic restrictions:
    • Between 7 PM and 7 AM, the street will be closed to westbound traffic between Beacon Ave S and Martin Luther King Jr. Way. Please use S Orcas St or other nearby arterials as detours.
    • Eastbound traffic will be maintained
    • Limited turns to / from driveways where paving is happening
    • Access to S Columbian Way/S Alaska St from side streets will be closed. Please access side streets from S Ferdinand St.
    • S Columbian Way east of S Alaska St will be closed to all turns
    • Access to cars for people walking will be maintained when parked in driveways and on side streets; please use designated crossings for your safety
  • Striping will take place approximately 2 weeks after paving is complete
 Grinding at Beacon Ave S and S Columbian Way Intersection
  • Work is scheduled for Saturday, May 18
  • Expect delays due to lane shifts and traffic holds
  • The intersection will remain open
    • Northbound traffic on Beacon Ave S will be detoured to 24th Ave S via S Ferdinand St
Biking through the work area: During this work, crews will need to close sections of the bike lanes on S Columbian Way to ensure they have enough space to complete work safely. We ask people biking to merge with general traffic when riding through the work area.

What to expect during construction
Qué esperar (haga clic aquí) | Những gì sẽ xảy ra (bấm vào đây) | 想了解有關信息 (點擊此處) | 예상할 것 (이곳을 누르세요) | Ano ang maasahan (i-click dito) | Maxaad fileysaa (riix halkan)
  • On-street parking and lane restrictions near work locations
  • Temporary sidewalk and crosswalk closures with signed detours
  • Noise, dust, concrete odors, and vibration
  • Access to businesses and homes will remain open
  • Work is weather dependent, so timing of work may change if needed
  • Bus stops in the work zone will be closed during work hours. For more detailed information, check out King County Metro's Rider Alert website.
For more information and translation, please call 206-256-5112. | Para mayores informes y traducción del material, por favor llame al 206-256-5112. | Để biết thêm thông tin và dịch thuật, vui lòng gọi 206-256-5112. | 需要更多的信息及翻譯資料,請致電 206-256-5112. | 추가 정보와 변역을 원하시면, 206-256-5112 에 전화하세요. | Para sa karagdagang impormasyon at pagsasalin, mangyaring tumawag sa 206-256-5112. | Warbixinno dhaaraad ah fadlan soo wac 206-256-5112.

Stay connected
  • Contact us directly at ColumbianAlaska@seattle.gov or leave a voicemail at (206) 256-5112
  • Visit our project website to learn more about the project
  • Request a briefing for your business or organization via email or phone
Please forward this email to others you think may be interested, or go to the project website to sign up for construction email updates.

Thanks for your patience and support while we complete this project. We’re working to minimize construction impacts as much as possible.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
EnviroIssues · 101 Stewart St Ste 1200 · Seattle, WA 98101-2449 · USA

Email Marketing Powered by Mailchimp