Correction: During work, the street will be closed to westbound traffic. Eastbound traffic will remain open. Earlier information we shared had us closing eastbound traffic. The rest of the information in this email update has not changed.

Starting today, crews will begin night work to remove the top several inches of asphalt on S Columbian Way and S Alaska St between Beacon Ave S and Martin Luther King Jr. Way to prepare for paving.

We realize the inconvenience this work creates and appreciate your patience. Please contact the outreach team immediately if you have any accessibility needs or questions.
 
Please see below for additional details about upcoming work.


Upcoming work
Night work on S Columbian Way and westbound detour
During grinding work, you can anticipate:
  • Work hours from 7 PM to 7 AM Monday, April 8 through Thursday, April 11 while crews work to minimize impacts to people traveling through the area. Crews have a temporary noise variance.
  • We expect grinding to take about 3 nights to complete.
  • Crews will focus work on one side of S Columbian Way/S Alaska St to maintain one lane of eastbound traffic, then flip to the other side of the street.
  • Detours and traffic restrictions:
    • Between 7 PM and 7 AM, the street will be closed to westbound traffic between Beacon Ave S and Martin Luther King Jr. Way. Please use S Orcas St or other nearby arterials as detours.
    • Eastbound traffic will be maintained.
    • Limited turns to / from driveways where grinding is happening.
    • Driveway access may be disrupted for 30 to 45 minutes as the grinding machine passes
    • Access to S Columbian Way/S Alaska St from side streets will be closed. Please access side streets from S Ferdinand St.
    • Access to cars for people walking will be maintained when parked in driveways and on side streets; please use designated crossings for your safety.
  • There will be rough pavement and steel plates on the roadway after grinding is complete.
  • Grinding will cause noise and dust.
Street repairs
  • Following grinding, crews will complete casting repairs, concrete base repairs, and asphalt base repairs. This work will happen during the day and will be noisy. 
Paving work
  • Crews plan to pave the street at night the week of April 15, following grinding work. This work is weather dependent. Traffic control will remain the same for this work.
  • Once paving is complete, temporary striping will be installed.
Biking through the work area: During this work, crews will need to close sections of the bike lanes on S Columbian Way to ensure they have enough space to complete work safely. We ask people biking to merge with general traffic when riding through the work area.
What to expect during construction
Qué esperar (haga clic aquí) | Những gì sẽ xảy ra (bấm vào đây) | 想了解有關信息 (點擊此處) | 예상할 것 (이곳을 누르세요) | Ano ang maasahan (i-click dito) | Maxaad fileysaa (riix halkan)
  • On-street parking and lane restrictions near work locations
  • Temporary sidewalk and crosswalk closures with signed detours
  • Noise, dust, concrete odors, and vibration
  • Access to businesses and homes will remain open
  • Work is weather dependent, so timing of work may change if needed
  • Bus stops in the work zone will be closed during work hours. For more detailed information, check out King County Metro's Rider Alert website.
For more information and translation, please call 206-256-5112. | Para mayores informes y traducción del material, por favor llame al 206-256-5112. | Để biết thêm thông tin và dịch thuật, vui lòng gọi 206-256-5112. | 需要更多的信息及翻譯資料,請致電 206-256-5112. | 추가 정보와 변역을 원하시면, 206-256-5112 에 전화하세요. | Para sa karagdagang impormasyon at pagsasalin, mangyaring tumawag sa 206-256-5112. | Warbixinno dhaaraad ah fadlan soo wac 206-256-5112.

Stay connected
  • Contact us directly at ColumbianAlaska@seattle.gov or leave a voicemail at (206) 256-5112
  • Visit our project website to learn more about the project
  • Request a briefing for your business or organization via email or phone
Please forward this email to others you think may be interested, or go to the project website to sign up for construction email updates.

Thanks for your patience and support while we complete this project. We’re working to minimize construction impacts as much as possible.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
EnviroIssues · 101 Stewart St Ste 1200 · Seattle, WA 98101-2449 · USA

Email Marketing Powered by Mailchimp